ALL U.S. ONLINE ORDERS: FREE 2-DAY UPS® DELIVERY Order by 5 PM ET for SAME DAY SHIPPING (Mon-Fri)

NEW CUSTOMER?
OPEN AN ACCOUNT!

NETWORK 8000 HOW-TO: installing/removing a distribution board

To power down a Network 8000 cabinet, remove one of the two main fuses located towards the bottom inside of the cabinet.


Installation Instructions

  • Disconnect all cables from the board
  • Remove the five screws securing it to the back plate.
  • Carefully remove the board from the cabinet.